Skip to content
As featured on HGTV Worst Yard on the Block · 3 episodes, Season 1 See the episodes →

Our process

How your fence project will go

Five steps from first call to finished fence, with approvals sorted out before any post goes in.

Stained board-on-board cedar fence

The short version

Five steps

01

Tell us about the property

Address, rough fence line, and photos if you have them.

02

Site visit & quote

We measure, note trees, slope, and drainage, and send an itemized quote.

03

Approvals & locates

RDRC or HOA packet, permit check, and Texas 811.

04

Build day

Layout, tear-out, posts, panels, gates, and cleanup.

05

Walkthrough

We test every gate with you and fix anything that's off.

Steps 1 and 2: the estimate

Your address tells us a lot: whether you're inside The Woodlands, the City of Houston, the City of Humble, or unincorporated Harris or Montgomery County; whether an HOA is involved; and whether the lot is near a creek or in a mapped flood zone. Photos and a rough length help us arrive prepared.

Small repairs can sometimes be priced from photos. New fences and replacements get a site visit, because footage, grade, and trees change the price. Your quote is written and itemized: footage, height, material, posts, gates and hardware, tear-out, and any clearing. See typical ranges in the pricing guide.

Step 3 in detail

Approvals, permits, and locates

This step takes the most calendar time and prevents the most expensive mistakes, so it's done before anything is built.

The Woodlands RDRC

Nearly every fence in The Woodlands needs written approval from your village's Residential Design Review Committee, applied for through the Township's Civic Access Portal. We prepare the site sketch, heights, materials, and stain details.

Woodlands rules →

HOA and deed restrictions

Most neighborhoods in Spring, Kingwood, Atascocita, and along I-69 have architectural review. We confirm the current guidelines for your lot and submit the package. Work starts after written approval.

HOA fencing →

City and county permits

Houston requires a permit only above 8 feet or for masonry; Humble requires one inside city limits; Harris County requires one in a mapped flood hazard area; Montgomery County requires a floodplain development permit in its floodplain. We tell you what applies before the quote is final.

Texas 811

We request utility locates before every dig. 811 doesn't mark private lines like sprinklers, landscape lighting, or septic, so show us where yours run.

We don't quote a permit fee, height limit, or HOA rule from memory. Each depends on the address, and we confirm it for your property.

Step 4

Build day

Most residential fences take one to three days on site. Rain, late 811 marks, or a slow approval can move the start, and we'll call if that happens.

  • Layout first. We stake the line and walk it with you.
  • Tear-out. The old fence comes down and leaves with us.
  • Posts. Set in concrete and sized to the soil; corners and gate posts go deeper.
  • Build and hang. Square, plumb, and gates that swing freely.
  • No surprise charges. If we hit buried concrete or a big root mass, we talk with you before anything changes.

Step 5

Walkthrough and aftercare

We walk the finished fence with you, open and close every gate, and fix anything on the punch list before we close out.

We'll explain care for your material. Wood does best with a stain once it dries out, with sprinklers aimed away. Metal and vinyl need an occasional rinse. As new posts settle, a gate may need a free adjustment.

Your 18-month workmanship warranty starts on completion.

Start with a site visit

Call or text (713) 331-9385, or book online. We'll check the rules for your address before you pick a fence.

Book a Free EstimateCall